Well, the last few days have been a lesson in patience. My husband is much better at it than I am. Apparently, the issue here is the closing inspection. The electrical, plumbing, and HVAC all have to be approved by separate people before the closing inspector can OK it for drywall and siding. Literally nothing that would cover any access points to the utilities can be accomplished while we coordinate all these inspections. Meanwhile, I feel like the coordination should have happened last week, so when we wanted all the inspections done this week, they would have gone smoothly. Now the inspections won't be done until Monday.
Some little things that were done: drywall patching on the wall connecting the master bedroom and bathroom, concrete stuff under the tub to prevent it from bowing and flexing, we got a new doorbell (surprise!)