Well, we had another snafu with the inspector arriving with no workers here to meet them, and my contractor got another tongue-lashing. Luckily, my husband was home today and he took note of what still needed to be done in order for us to finally pass inspection. Apparently, when they installed the drain pipe for the bathtub, they cut a hole through the joist underneath the floor. This does not meet code, so the carpenters had to glue another joist next to the cut one.
On a more fun note, I picked out the vanity, shower wall, and toilet today! Seriously, there are just waaay too many design options. It's a good thing I'm a fairly decisive person, otherwise, I'd have collapsed on the showroom floor!
The bottom tile is the floor, the walls will be the light purple on the sample card, the vanity wood is dark cherry (matches our bedroom furniture), the marbly square on top of the wood will be our vanity top, the little porcelain tile on the bottom left is our tub color (white), and the square on top of that is the color of our solid surface shower wall.
The toilet is a double flush system - a half flush for liquid waste and a full flush for big stuff... :)
No comments:
Post a Comment